SI |
Company |
Name of the project |
Executed in the year |
No. of Workers Employed |
Categories Employed |
1 |
SPIE-CAPAG, FRANCE |
Bakhrabad Demra Gas Pipeline Client : Bakhrabad Gas System Limited (BFL). |
1985-87 |
336 nos |
High Pressure Welder, Utility Welder, Sandblaster, Grinder, Wrapper, Pipe Fitter / Fabricator, Operator (Side-Boom, Sober, pay Loader, Excavator, Grader, Low-bed, Crane, Fork Lift), Surveyor, Foreman, (Civil /Trenching/ Backfilling), Radio Graphed, Mechanic,(Equipment, Vehicle Hvy / Light), Driver Hvy/Lt, Electrician(Auto Mobile / General / Air Condition) General Lab our Security man, etc. |
2 |
SAIPEM SPA, ITALY |
North south gas Pipeline
Client : Project Implementation Unit (PIU) |
1990-92 |
1108 nos |
High Pressure Hand Welder, High Pressure passo Welder, Utility Welder, Sandblaster, Grinder, Wrapper, Pope Fitter / Fabricator, Operator (Side-Boom, Dozer, Pay Loader, Excavator, Grader, Low-bed, Crane, Fork-Lift, Pay Welder), Surveyor Foreman, (Civil stringing / Trenching /Backfilling / Camp). Radio Graphed, Mechanic, Driver, Electrician, Security Personnel. |
3 |
SPIE-CAPAG, FRANCE |
Brahmaputra Basin Gas Pipeline
Client : Titas Gas Transmission and Distribution Company Ltd(RGTDCL). |
1991-92 |
852 nos |
High Pressure Welder, Sandblaster, Grinder, Pipe Fitter / Fabricator, Operator (Side-Boom, Dozer, Pay loader, Excavator, Grader, Low –bed, Crane, Fork Lift Coating Machine, Trenching), Surveyor, Foreman (Civil / Trenching / Backjilling), Radio Grapher, Mechanic, General Lab our, Securityman etc. |
4 |
BONATTI SPA, ITALY |
Dinajpur-panchagarh Highway Rehabilitation Client : Govt of Italy and Roads and Highways Department (RHD) of Bangladesh. |
1992-95 |
954 nos |
Engineer Civil, Surveyor, Laboratory Technician, Operator (Dozer, Pay Loader, Excavator, Grader, Low-bed, Crane, Road Eoller, Fork-Lift, Crusher, Trascavator, Weigh Bridge, Batching Plant ), Foreman (Earth Cutting / Asphalt Laying), Mechanic (Equipment, Vehicle Heavy / Light) etc. |
|